| Hazardous waste site remediation - 1990 - 184 pages
...site, operate the equipment on-site during the demonstration, and remove the equipment from the site. EPA is responsible for project planning, sampling...assurance and quality control, preparing reports, and disseminating information. If the developer is unable to obtain financing elsewhere, EPA may consider... | |
| Government publications - 1990 - 68 pages
...selected site, and is expected to pay the costs to transport, operate, and remove the equipment. US EPA is responsible for project planning, sampling...assurance and quality control, preparing reports, and disseminating information. The Technology Evaluation Report The results of the Soliditech SITE... | |
| Steven C. McCutcheon, Jerald L. Schnoor - Science - 2004 - 1019 pages
...responsible for operating innovative systems on the site and for paying the costs of the evaluation. The US EPA is responsible for project planning, sampling...transporting and disposing of treated waste materials. McCormick and Baxter: Pentachlorophenol and Polycyclic Aromatic Hydrocarbons in Soil The first SITE... | |
| Rafael Vazquez-Duhalt, Rodolfo Quintero-Ramirez - Technology & Engineering - 2004 - 564 pages
...innovative system on site and are expected to pay the costs of the demonstration, together with site owners. EPA is responsible for project planning, sampling...transporting and disposing of treated waste materials. Under Superfund laws, EPA (1998) [88] lists nine criteria for consideration: 1 . Overall protection... | |
| |